Labor Estimator

Tech Install · Tech Shop · Project Management · Project Engineering · CAD

Proposal BOM
Estimator workbook
Page

Export BOM is available after importing a proposal BOM.

Start an estimate

Everything starts at zero. Import a proposal BOM to fill in rooms and equipment, or build the list by hand.

Summary

Updates live as you change inputs below.
Tech Install
0.0
hours
Tech Shop
0.0
hours
Project Mgmt
0.0
hours
Project Eng.
0.0
hours
CAD
0.0
hours
Total Labor
0.0
hours
How these numbers were calculated

    1Rooms / Systems

    Qty = number of identical rooms. Install hours here are per-room overhead on top of equipment.

    Pick how each room is counted. Room totals: only the hours typed in that row count, exactly, and its equipment is reference only. Equipment-based: the equipment assigned to the room plus the room overhead typed in that row. Switching back restores the values you last had for each basis.

    Room / System Labor basis Qty Install /room Shop /room PM /room PE /room CAD /room Install hrs Other hrs counted Remove

    Install subtotal: 0.0 h · other counted: 0.0 h

    2Equipment & install hours

    Install hours per unit × quantity. Assign lines to rooms, or leave Global / Shared for headend gear.
    Select Item Room Qty Install /ea Shop /ea PM /ea PE /ea CAD /ea Install hrs Other hrs counted Remove

    Install subtotal: 0.0 h · other counted: 0.0 h

    Advanced: per-line hours for Shop / PM / PE / CAD

    Most estimates only need install hours plus the percentages in step 3. Columns stay visible while per-line hours are being counted.

    3Overhead & adjustments

    Shop, PM, PE and CAD can be a percentage of final Install, or a sum of per-line hours (Advanced).

    Percentage mode replaces any per-line hours for that category — the two are never added together.

    Tech Shop

    Project Management

    Project Engineering

    CAD


    Tech Install — crew & rounding

    Use 2+ when a display is >50" or there is a cable pull. Labor bills the same for 2 or more technicians.

    On-site duration rounds up to a full day, then multiplied by crew size.

    Advanced: flat extras and minimum hours

    Tech Install

    Tech Shop

    Project Management

    Project Engineering

    CAD

    Flat hours are added after the percentage or line sum. Minimums apply only when there is some work in that category.

    Advanced: room-count scaling (PM & PE, line-hours mode only)

    Decay factor = max(0.10, 1 / (qty − 1)^0.7); qty ≤ 2 is unaffected. Only applies to per-room PM/PE hours that are being counted.

    Advanced: CAD drawing pages (CAD line-hours mode only)
    Drawing / Sheet Pages Hrs /page Complexity CAD hrs Remove

    Drawing-page subtotal: 0.0 h

    4Results by room

    Final hours after percentages, crew, rounding and minimums, spread across rooms.

    Add or import rooms to see the per-room split.

    Hours estimate generated with AV Toolkit Labor Estimator. Monetary values are not part of this estimate.